2 X 4.95 MW Bunker-Fired Plant
Barangay Iraan, Aborlan, Palawan
The 2 X 4.95 MW Bunker-Fired power plant is a power generating plant established in Aborlan, Palawan Island. It is situated in a 30,000 sq.m. lot near or around Kilometer 59 along the Puerto Princesa South Road at Brgy. Iraan, Aborlan, Palawan. DMCI Power, through an agreement with NPC and PALECO, will be providing baseload/peaking power demand of the island. The project will address the low voltage and power reliability problems in Aborlan, and will also provide power to the rest of the Southern Palawan through NPC’s 69KV Transmission Line.
Quick facts
2 x 4.95MW BUNKER-FIRED PLANT- ABORLAN, PALAWAN |
|
Plant Geographical Location | Brgy. Iraan, Aborlan, Palawan |
Installed Facilities |
|
27MW DIESEL GENERATING SETS- IRAWAN, PUERTO PRINCESA CITY |
|
Plant Geographical Location | Brgy. Irawan, Puerto Princesa City, Palawan |
Installed Facilities |
|
SATELLITE POWER PLANTS |
|
Plant Geographical Location | Brgy. Tabon, Quezon, Palawan |
Installed Facilities |
|
Plant Geographical Location | Brgy. Tubtub, Brooke’s Point, Palawan |
Installed Facilities |
|